Contract award · W58RGZ18F0061

THIS STATEMENT OFWORK (SOW) DEFINES THE NON-RECURRING AND RECURRING EFFORTS REQUIRED FOR THE RETURN TO FLIGHT OF FIVE SH-60F AIRCRAFT (BUREAU NUMBERS (BUNOS) TO BE DETERMINED AFTER INSPECTION) FOR THE UNITED STATES NAVY (USN) FOREIGN MILITARY SALES (FMS) CASE IS-P-SCG. DURING THIS EFFORT THE CONTRACTOR SHALL INSPECT EIGHT SH-60F AIRCRAFT AND PROVIDE A RECOMMENDATION FOR THE SELECTION OF THE FIVE AIRCRAFT TO BE RETURNED TO FLIGHT. THE REMAINING THREE AIRCRAFT WILL BE STORED UNDER THIS DO IN A NON-FLYABLE CONDITION. AFTER THE SELECTION OF THE FIVE SH-60F AIRCRAFT THE CONTRACTOR SHALL: PROVIDE AN INTEGRATED MASTER SCHEDULE (IMS); PERFORM PLANNED MAINTENANCE INTERVAL (PMI) AND PHASE MAINTENANCE; PERFORM REMOVAL AND INDUCTION OF LISTED PARTS FOR INDUCTION INTO THE REPAIR AND RETURN CYCLE; STRIP, PRIME AND PAINT; APPLY OUTSTANDING TECHNICAL DIRECTIVES (TDS); ENSURE ALL REQUIRED SAFETY AND MAINTENANCE MESSAGES HAVE BEEN COMPLIED WITH; CONDUCT APPLICABLE MODIFICATIONS; CONDUCT MAINTENANCE AND ACCEPTANCE FLIGHTS, AIRCRAFT STORAGE AND DELIVERY OF FIVE SH-60F AIRCRAFT IN FLYABLE CONDITION AND STORAGE AND DELIVERY OF THREE AIRCRAFT IN NON-FLYABLE CONDITION. THE FINAL CONFIGURATION OF THE FIVE FLYABLE AIRCRAFT SHALL BE IN ACCORDANCE WITH THE FINAL FLIGHT CLEARANCE AS LISTED IN THE NAVAL AIR TRAINING AND OPERATIONS STANDARDIZATION (NATOPS), PER PARAGRAPH 3.1 OF THIS SOW (CURRENT REVISION), AND ANY OUTSTANDING GOVERNMENT TDS.

Awarded to SCIENCE AND ENGINEERING SERVICES, LLC · CAGE 4Q232

Latest reported total obligated
Not reported
Net observed obligations
$5.4M
Observed contract actions
23
Observed period
FY2019–FY2025

Reported totals are cumulative values from the latest available award record. Observed obligations and actions reflect Mimir's FY2019 onward transaction window and may omit earlier activity.

Award parties and scope

ContractorSCIENCE AND ENGINEERING SERVICES, LLC
CAGE4Q232
CustomerDepartment of the Army
Performance locationHUNTSVILLE, ALABAMA, UNITED STATES

Procurement details

First observed actionJan 3, 2019
Latest observed actionJul 28, 2025
PSC1680
NAICS336411 · Aircraft Manufacturing
CompetitionFULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
PricingFIRM FIXED PRICE

Annual observed obligations

FY2019
$206.7K
FY2020
$1.4M
FY2021
$3.9M
FY2025
-$160K

Continue exploring

Ask Mimir about W58RGZ18F0061

Continue with this contract award already in context.

Continue
Explore the full award in Mimir

Open the complete action history and connected analysis in the platform.

Privacy at Mimir

We use first-party product analytics to improve Mimir. You can opt out or choose campaign measurement.