JASSM
Leading contractors
- • THE PURPOSE OF THIS EFFORT IS TO BEGIN PHASE 1 ACTIVITIES RELATED TO DEVELOPING THE AGM-158 XR BLOCK 0 AIRFRAME.
- • JOINT AIR-TO-SURFACE STANDOFF MISSILE ITIK BUY 4/LI-ION PROD 2/NIMH PROD 3
- • JOINT AIR TO SURFACE STANDOFF MISSILE
- • JOINT AIR-TO-SURFACE STANDOFF MISSILE (JASSM) FINLAND PTM INSTALL/TRAINING
- • JOINT AIR TO SURFACE STANDOFF MISSILE ENTERPRISE MANAGEMENT SYSTEM, JEMS 9.0
- • JEMS 7.0
- • THE PURPOSE OF THIS DELIVERY ORDER IS TO AWARD JASSM SECOND SOURCE ENGINE ENGINEERING AND MANUFACTURING DEVELOPMENT IN ACCORDANCE WITH THE STATEMENT OF WORK.
- • F-35 AARGM-ER EARLY INTEGRATION
- • JOINT AIR TO SURFACE STANDOFF MISSILE PROGRAM - AUTOROUTER
- • JASSM AUTOROUTER
- • JOINT AIR TO SURFACE STANDOFF MISSILE ENTERPRISE ANALYTICS SUPPORT
- • JOINT AIR TO SURFACE STANDOFF MISSILE FTS BATTERIES SBIR PHASE III
Defense customers
Connected NSNs
No connected NSN is shown.
Recent observed awards
THE PURPOSE OF THIS EFFORT IS TO BEGIN PHASE 1 ACTIVITIES RELATED TO DEVELOPING THE AGM-158 XR BLOCK 0 AIRFRAME.
JASSM ENGINEERING SUPPORT - PRODUCTION 9.0
TO PROVIDE DELIVERABLE END ITEMS OF SUPPLY SUCH AS, BUT NOT LIMITED TO, ADDITIONAL HARDWARE TESTING, SOFTWARE MIGRATION/CONVERSION, SOFTWARE TO INCLUDE DEVELOPMENT AND UPGRADES, INFORMATION TECHNOLOGY, DATA, AND ENHANCEMENT.
THE CONTRACTOR SHALL DEVELOP AND MODIFY CURRENT SOFTWARE TO ALLOW THE JASSM SYSTEM TO EXECUTE NEW CAPABILITIES AND INTEGRATE ON PLATFORMS IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES.
Continue exploring
Continue with this platform already in context.
ContinueOpen deeper contract, supplier and NSN analysis in Mimir.
Continue